Veiligheid en Kwaliteit — Ingebou in Elke Projek.

zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, /news
zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, /news
Navraag
zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, /news
zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, zeyong-steel-structure-delivers-beam-yard-for-china-railway-16th-bureaus-zhengzhou-south-railway-station-project, 
Navraag

Zeyong Steel Structure lewer die balkwerf vir die Zhengzhou Suid Spoorwegstasie-projek van die 16de Spoorwegburo van China

2026/08/04

Zeyong Steel Structure lewer die balkwerf vir die Zhengzhou Suid Spoorwegstasie-projek van die 16de Spoorwegburo van China
As ’n noodsaaklike komponent van China se spoorweginfrastruktuurontwikkeling, het die uitbreidingsprojek van die Zhengzhou Suid Spoorstasie ten doel om die streek se spoorvervoerkapasiteit aansienlik te verbeter. Zhejiang Zeyong Steel Structure Engineering Co., Ltd. het met sukses die staalstruktuurkonstruksie van die balkwerf (insluitend die mengstasie) vir aanbiedingsgedeelte NZSG-04 voltooi, wat deur China Railway 16de Buro toegewys is, en bied soliede infrastruktuurondersteuning vir hierdie nasionale spoorwegprojek.
 
beam-yard-delivered-for-zhengzhou-south-railway-station-project6.jpg beam-yard-delivered-for-zhengzhou-south-railway-station-project4.jpg

 

Strategiese ligging & skaal

Die balkwerf is strategies geleë suid van Xiaolizhuang en wes van Limazhuang-dorp, Nancaostraat, Guancheng-distrik, Zhengzhou-stad, langs die afwaartse kant van spoorlynmile JGDK689+840 tot JGDK689+620. Met ’n oppervlakte van 223 akker beskryf die fasiliteit ’n lengte van 780 meter en ’n wydte van 183 meter, en dien as die kernkonstruksiebasis vir brugontwerp in hierdie projekgedeelte.
 

Massiewe voorvervaardigingsmissie

Die balkwerf dra die kritieke verantwoordelikheid om betonbalks vir die hele Zhengzhou-suidspoorstasie-brugprojek voor te vervaardig, met die volgende produksieomvang:

 

T-vormige balks: 548 stukke in totaal
  • Dubbellyn-T-vormige balks: 528 stukke (spanning 32 m, 24 m en 20 m)
  • Enkellyn-T-vormige balks: 20 stukke (spanning 32 m, 24 m en 20 m)

 

Boksbalke: 220 spanne in totaal
  • Dubbellyn-boksbalke: 54 spanne (32 m en 24 m spanne)
  • Enkellyn-boksbalke: 166 spanne (32 m en 24 m spanne)

 

Hierdie voorvervaardigde betonbalks sal direk vir spoorwegbrugkonstruksie geïnstalleer word, wat uiters presiese werk en streng gehandhaafde gehaltebeheer gedurende die vervaardigingsproses vereis.
 
beam-yard-delivered-for-zhengzhou-south-railway-station-project10.jpg beam-yard-delivered-for-zhengzhou-south-railway-station-project8.jpg

 

Volledige fasiliteitopset

Die balkwerf het ’n goed-georganiseerde opset met toegewyde funksionele sones:

 

  • Kantoorarea en woonkwartiere vir personeel op die werf
  • Beton Mengstasie vir aanhoudende materiaalvoorsiening
  • Toetslaboratorium vir kwaliteitsversekering
  • T-balkvervaardiging- en -bergingareas
  • Boksbalke-vervaardiging- en -bergingareas
  • Staalversterkingverwerkingwerkswinkel
  • Materiaalbergingstreek

 

Zeyong Steel Structure het volledige staalstruktuurfasiliteite vir hierdie funksionele areas verskaf, wat effektiewe werkvloei en bedryfsveiligheid oor die hele balkwerf verseker.

 

beam-yard-delivered-for-zhengzhou-south-railway-station-project1.jpg beam-yard-delivered-for-zhengzhou-south-railway-station-project5.jpg

 

Zeyong se bydrae met betrekking tot staalstrukture

As ’n professionele staalstruktuuronderneming met uitgebreide ervaring in spoorweginfrastruktuurprojekte, het Zeyong die ontwerp, vervaardiging en installasie van staalstruktuurfasiliteite binne die balkwerf onderneem. Die maatskappy se vermoëns het die volgende ingesluit:

 

  • Staalstruktuurwerkswinkels vir toestelbeskerming en weerbestandheid
  • Ondersteuningsraamwerke vir balkvervaardigingsareas
  • Bergfasiliteitstrukture vir materiaal en klaar balks
  • Kantore en woonkwartiere met staalraamkonstruksie

 

Deur sy gevorderde staalstruktuurvervaardigingstegnologie en noukeurige gehaltebestuurstelsel het Zeyong verseker dat al die staalkomponente presiese spesifikasies en nasionale standaarde bevredig het, wat die balkwerf in staat gestel het om produksie volgens plan te begin en aan die streng tydskedule van China Railway 16th Bureau te voldoen.

 

beam-yard-delivered-for-zhengzhou-south-railway-station-project3.jpg beam-yard-delivered-for-zhengzhou-south-railway-station-project11.jpg

 

Toewyding aan Gehalte & Levertyd

Gedurende die hele projek het Zeyong sy kernbeginsel van "Veiligheid eerste, Gehalte eerste" gehandhaaf deur gehaltebeheer oor die hele proses te implementeer — van materiaalinkoop tot finale installasie. Die maatskappy se bewese rekord in groot-skaalinfrastruktuurprojekte, gekombineer met sy 800 000 m² groot produksiebasis en professionele span van meer as 200 werknemers, het stabiele gehalte en tydige lewering vir hierdie uitdagende spoorwegprojek wat deur China Railway 16th Bureau toegewys is, gewaarborg.

 

Ondersteuning van Nasionale Infrastruktuur

Die uitbreiding van die Zhengzhou Suidspoorstasie verteenwoordig ’n beduidende waterskeiding in China se voortdurende spoorwegmoderniseringsinspannings. Deur professionele staalstruktuuroplossings het Zeyong weer eens sy omvattende vermoë om kritieke infrastruktuur vir groot vervoerprojekte te lewer, bewys. Die suksesvolle voltooiing van hierdie balkwerfkonstruksie vir China Railway 16th Bureau verstewig verder Zeyong se posisie as ’n betroubare staalstruktuurvennoot vir spoorweginfrastruktuurontwikkeling.

Laaste nuus

Verken ons nuutste maatskappy-nuus, projekgevalle en nydinsigte.

Wen-Wen-sameWERKING vir ’n gedeelde toekoms – Die suksesvolle afsluiting van CRCC 11de Burogroep se 2025 Jaarlikse Verskafferkonferensie

Wen-Wen-sameWERKING vir ’n gedeelde toekoms – Die suksesvolle afsluiting van CRCC 11de Burogroep se 2025 Jaarlikse Verskafferkonferensie

Chongqing Spoorvervoerlyn 4 Wesuitbreiding amptelik geopen – Huzhou Zeyong Staalstruktuur bou soliede ondersteuning vir ondergrondse korridore

Chongqing Spoorvervoerlyn 4 Wesuitbreiding amptelik geopen – Huzhou Zeyong Staalstruktuur bou soliede ondersteuning vir ondergrondse korridore

Huzhou Zeyong Staalstruktuur: Bevordering van globale infrastruktuur met geïntegreerde staaloplossings en uitnemendheid in geprefabrikeerde boue

Huzhou Zeyong Staalstruktuur: Bevordering van globale infrastruktuur met geïntegreerde staaloplossings en uitnemendheid in geprefabrikeerde boue

Kry 'n Aangepaste Offerte

Deel u projekbesonderhede vir staalstrukture, en ons tegniese span sal met 'n doelgerigte plan en mededingende prys reageer.
E-pos
Selfoon/WhatsApp
Naam
Maatskappy Naam
Boodskap
0/1000